Sunday, January 18, 2015

Winter progress

Finally got a break in the weather being above 30 and not high humidity so I was able to tape up the floor with sheet metal repair tape and paint most of it with the latex paint.  I missed a few small holes that I noticed after the paint, and I need to get the heater out and paint under the copper piping, so still under the mercy of the weather for those tasks then on to the plywood flooring. 




No comments:

Post a Comment